Melbourne Cricket Ground - Rod Laver Arena footbridge closure
  • MCC Logo
  • NSM Logo

Rod Laver Arena footbridge closure

Jan 17, 2011

Footbridge between Rod Laver Arena and the MCG.MCG patrons are advised that during the Australian Tennis Open, (Monday January 17 - Sunday January 30) the footbridge connecting Rod Laver Arena and the MCG will be closed as a thoroughfare.

Access from the MCG side of the footbridge will only allow people to reach the tram terminus or the entry gates to the Australian Open.

Those requiring a thoroughfare route will be able to use the bridge connecting the MCG with Hisense Arena which will remain open to pedestrians throughout the tennis.


VETERAN batsman Younis Khan swatted Michael Clarke’s men on a road to nowhere as Pakistan set up a drought-breaking series triumph in Abu Dhabi.

Herald Sun

I GUESS I’m a fringe Derby Day player this year. But it’s Derby Day, and just being a player is a big deal, when all the jocks have their game faces on.

Herald Sun

DAVID Villa was starting to recapture his best form at Melbourne City, what a shame he’s going back to New York, Herald Sun’s David Davutovic writes.

Herald Sun

THE stamina reserves of Hampton Court and Sweet Idea have been debated all week but were summarily dismissed by trainer Gai Waterhouse on Friday.

Herald Sun

IS Daniel Ricciardo getting into the spirit of Halloween? Has the lost a bet? Or is he getting ahead start on Movember? Mystery surrounds his new-look facial hair

Herald Sun